REVIEW OF THE BRECON BEACONS NATIONAL PARK LOCAL DEVELOPMENT PLAN (2007-2022)
CURRENTLY ON PAUSE
On 17th December 2017, the Authority commenced the Review of its Local Development Plan
This review concluded that the Authority should produce a replacement Local Development Plan which is referred as Local Development Plan 2 or LDP2.
The current Local Development Plan remains in force and will do until such a time as Local Development Plan 2 is adopted.
You can read about the issues considered in deciding to replace the Local Development Plan here
How the Authority intends to produce the replacement plan is set out in our Delivery Agreement
The Local Development Plan (LDP) 2 is currently on pause as a result of the phosphate constraint. Following confirmation from Welsh Government the adopted Local Development Plan (2007-2022) remains in place and material.
If you would like to receive policy updates, join our mailing list by emailing strategy@beacons-npa.gov.uk.
The following table provides the stages in preparing a replacement Local Development Plan.
The names of the stages will link to the document once they are prepared and dates of the consultation period added.
Document | Consultation Dates |
Review Report | 5th July 2018 – 30th August 2018 |
Delivery Agreement | 5th July 2018 – 30th August 2018 |
Candidate Sites | 4th July 2019 – 29th August 2019 |
Preferred Strategy | 4th July 2019 – 29th August 2019 |
Delivery Agreement Amendment Revised Preferred Strategy Deposit Local Development Plan |
|
Focused Changes | |
Submission | |
Examination | |
Matters Arising Changes | |
Adoption |
Preparation Stages
These are the stages in preparing a replacement Local Development Plan.
The names of the stages will link to the document once they are prepared and dates of the consultation period added.